Preconstruction 101 for Heavy Civil: Where Profit Is Made

In heavy civil work, most companies think money is made once the excavators hit the ground. The truth? Profit or loss is decided long before. Preconstruction isn’t paperwork. It’s the phase where risk, cost, and credibility are either locked in or lost.


Here’s the lean playbook:


ree

1. Nail the Takeoff

Quantity errors are silent killers. A missed 500 feet of pipe or one extra lane mile can erase margin. Invest in precise digital takeoffs and cross-check them.


2. Respect Geotech

Soil conditions dictate everything. Treat geotechnical reports like gold. If they’re vague, assume risk and budget contingencies don’t hope for the best.


3. Spot Utility Conflicts Early

Clashes with water, sewer, telecom, or gas can shut down entire schedules. Map conflicts during precon, not in the field when delays cost thousands per day.


4. Build a Risk Register

Every job has risks: weather, materials, traffic control, permitting delays. List them, assign owners, and track mitigation plans. The best PMs aren’t lucky they’re prepared.


5. Value-Engineer Without Cutting Corners

Owners love savings, but not shortcuts. Smart alternates (e.g., recycled aggregates, different staging plans) show you’re solving problems while protecting scope.


In heavy civil, the field team executes but the preconstruction team sets the stage. Tight takeoffs, solid geotech, early conflict spotting, and a disciplined risk log are what separate profitable projects from painful ones.


Don’t just plan the job. Win it in precon.


Comments


South Florida Business Association

©2024 by South Florida Business Association

(954) 451-2341

Subscribe Form

Thanks for subscribing!

BASED IN FLORIDA, 
AVAILABLE WORLDWIDE

bottom of page